[Sell] Door gasket welding machine

The offer to Sell • Get Seller informations • Who is following this lead ?

August 24, 2011 - Refrigeration and Heat Exchange

It is automated product line, which process is as follows:First, loading comminution pvc materials to mixing device manully, then running the auto work cycle process-drying and transmitting to loading device-plasticizing, extruding and forming cooling the forming dies-cooling in the cycle water container-drying with compress-air blowing -towing with tow device-automatic punch device-transmitting workpiece with manipulator-placing workpiece-last, moving the workpiece manually. The characteristics of this line are as follows: 1. It introduces automatic production and has high producing efficiency.Comparing with the old line, the work cycle time is 1/5and only need one operator to operate.
2. It is easy to operate and control quality during production.
3. It provides flexible process with PLC system and touch screen technology from DELTA company, which is easy to adjust and control the production.

loading search optionsLoading image...
Rate this lead : 
Rate this | Rated 0/5 (0 Votes)
I am interested in ! Post your trade lead !
 

Seller contact details • Others trade leads from this contact

Contact name :Available for registered members only
Company name :Qingdao Hengjun Equipment Manufacturing Limited Company
View company informations
Country : CHINA
Activity sector :Industrial Equipment
 

Others trade leads published by this contact

Qingdao Hengjun Equipment Manufacturing Limited Company has 1 more trade leads listed
Find below the last published trade leads

August 24, 2011 Refrigerator Door Gasket Production Line

Followers and network

Nobody is currently following this trade lead.
 
© 2000 - 2012 Business Patrol All rights reserved